Sara B To Do list - 8/16/10

 

Job

Status

Who

Hours

Deck

 

 

 

    Rmv deck hardware (windlass, cleats, etc.)

done

Sue, Rich

?

    Rmv taff-rail, board underneath

done

Sue, Rich

?

    Rmv foremast partner ring

 

 

 

    Rmv pin-rail legs, support pin-rail(?)

 

 

 

    Rmv deck prism

done

Sue

?

    Deck fills

done

 

 

        Holding tank - should be removable

done

Sue

 

        Fuel - check; need access (see rmv exhaust)

done

Chris

2

        Water - check;  may lift out

done

Sue

 

        If any fills not removable without major surgery ,

           cut hole in plywood/glass & add access plate

no need

 

 

    Replace stbd covering board section

 

 

 

        Rmv

done

Sue

 

        Requires chain plates removed

done

 

 

        Cut lap joint fwd

 

 

 

        Clean deck edge

 

 

 

        Make pattern & cut

done

John

6

        Install

 

 

 

            Bed laps, maybe white lead?

 

 

 

    Rmv chain plates

done

Chris

10

        Stbd aft needs access (see rmv exhaust)

 

 

 

        Try welding threaded rod to heads and extract

done

Chris

 

    Fill fastener holes that don't go thru and can't be re-used

 

 

 

        Thru bolts, etc., can be drilled from below

 

 

 

    Rmv cockpit trim

 

 

 

    Port aft covering board section - ~4'

 

 

 

        Rmv

done

Sue

 

        Lap joint on newer board

 

 

 

        Take pattern, cut

 

 

 

        Install

 

 

 

    Rmv rudder stock

 

 

 

    Steel sleave

       How to handle glassing bottom

       Can we leave in place for deck work?

 

 

 

    Fill gouges

 

 

 

    Grind off broken fasteners (rmv if possible)

 

 

 

    Plane off transom flush with deck

 

 

 

    Fill low spots, fair deck – Bondo?

 

 

 

    Cut & fit 1st layer of luaun, lightly fasten

 

 

 

    Rmv, thin layer bedding compound (tar?)

 

 

 

    Reinstall, final fasten (ss drywall screws?)

 

 

 

    Cut & fit 2nd layer, glue + lightly fasten to hold in place

 

 

 

    Cut shallow notch in cabin sides, posts

 

 

 

    Polyester – mat+roving+mat+mat

 

 

 

    Glass to edge of deck & trim

 

 

 

    Wrap up in notches (maybe just mat?)

 

 

 

    Roll in non-skid – last mat layer

 

 

 

    Radius edge to wrap hull glass over deck

 

 

 

    [glass hull before proceeding]

 

 

 

    Paint

 

 

 

    Reinstall deck hardware

 

 

 

    Remove exhaust

Done

Chris

2

    Replace deck planks rmvd for chain plate job

 

 

 

    Finish chain plate/fuel fill access hole

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Keel

 

 

 

    Finalize profile

 

Chris

 

    Assemble lift

done

Chris Sue John

4,1,1

    Add casters to lift for moving

Done

Chris

5

    Mark line along keel to detect hogging

 

 

 

    Raise hull 4 inches

 

 

 

    Block leaving new keel area open

 

 

 

    Possible support in middle with lift  

 

 

 

    Buy 3/8 x 5.5 flatbar

done

Chris

 

    Buy 3/4” threaded rod, hot-dip galvanised

Done

Chris

 

    Buy fiberglass cloth strips

 

 

 

    Cut wood keel section off

 

 

 

    Drill keel bolt holes; must be vertical, parallel to each other, and centered – particularly on the bottom

 

 

 

    Position & support flatbar; weld or bend at angle

 

 

 

    Insert keel bolts and position carefully – consistent level below wood keel

 

 

 

    Weld ¼ x 2 flatbar from bottom flatbar to keel bolts

 

 

 

    Lay 1st layer of lead, notch for welds

 

 

 

    Lay cloth, width to wrap under and overlap (16”?)

 

 

 

    Next layer of lead

 

 

 

    Cloth, width to cover 2 bars sides (11”?)

 

 

 

    Repeat

 

 

 

    Fill gaps between sides of bars with 1/4” strips of ?

 

 

 

    Fill triangular gaps with wedges of ?

 

 

 

    Apply resin to cloth, sides & underneath flatbar

 

 

 

    Fill with resin (?)

 

 

 

    Bedding compound on to (tar?)

 

 

 

    Draw up (jack?) to wood keel

 

 

 

    Add deadwood fairing fore & aft as needed

 

 

 

 

 

 

 

 

 

 

 

Glassing hull

 

 

 

    Rmv thru-hulls, keel cooler

 

 

 

    Stem – rmv inner block / samson post brace covering bolts

Done

Chris

2

        Replace block

 

 

 

        Add scarf bolts

 

 

 

    Prop shaft mods

 

 

 

        Securely mark prop shaft angle/position

 

 

 

        Rmv prop, shaft and bearing/stuffing box

 

 

 

        Create heavy fiberglass tube sized for cutlass bearing with length 6” inside, 3” outside

 

 

 

        Position using shaft/marks & anchor well in stern post

 

 

 

        [glass sternpost]

 

 

 

        Bond hull glass with shaft tube, build up, possibly with epoxy

 

 

 

        Install cutlass bearing, stuffing box

 

 

 

    Rudder    

 

 

 

        Rmv lower metal strap

 

 

 

        Cutoff/rmv lower stock support

 

 

 

        Carve stern post to allow thickness of glass plus radius corners

 

 

 

        Cut away fwd of metal tube to allow wrapping glass completely around tube

 

 

 

        [glass sternpost]

 

 

 

        Add fairing to aft face of stern post ?

 

 

 

        Fabricate metal (bronze/ss)  stock bottom fitting

 

 

 

    Glass sternpost before doing hull ?

 

 

 

        Fair prop cutout, check prop clearance

 

 

 

    Hull prep

 

 

 

        Scrape/sand/rmv loose stuff

 

 

 

        Clear putty from seams, caulk with tar ?

 

 

 

        Fair hull indentations, gouges, chain plate notches

 

 

 

        Fair keel/stem

 

 

 

        Carve back at stem fitting to allow clearance with glass

 

 

 

    Glassing

 

 

 

        Topsides schedule: mat, rvg, mat, rfg

 

 

 

        Wrap topsides glass over deck 3 inches

 

 

 

        Add mat, rvg layer at waterline

 

 

 

        Add mat, rvg layer mid garboard

 

 

 

        Wrap all layers under keel, end at keel bottom opposite edge

 

 

 

        Interleave keel bottom overlap between mat/rvg layers

 

 

 

        Final complete mat,mat layer

 

 

 

        Mechanical fastening schedule

 

 

 

            Topsides: Staples in 1st mat,rvg layer

 

 

 

            Below waterline: Ribbed roofing nails or screws, pre-drill, in 2nd mat,rvg layer, 1” in planking, 2” in keel & lower garboard