Home |
November 21, 2010 Post 33 |
November update |
Stbd covering board removed |
Lifting in preparation for keel work; string indicates cut location |
Making the cut |
Installing plywood |
The 'theoretical' keel/ballast profile; the lower diagram represents the original ballast distribution |
A new floor (no keel bolt hole yet); the rod in the old floor was added a couple of years ago and is raised because of keel cut |
Stripping cabin top |
Keel bolt hole from below |
Keel bolt & flat bar tacked in place |
Keel frame welded, primed and in position |