Home
The Schooner Sara B Log

Back to indexPrevious PostNext Post

August 05, 2010     Post 32
Quick Update



Work continues, of course slower than hoped and behind schedule. The Thorneycroft is out (of the way) - hopefully we'll have time to pay attention to it this winter. Almost everything that needs to has been removed from the deck in preperation for its plywood/glass covering. Some new covering board sections to be installed. New keel profile and design about finalized. Still hoping to have deck covered, keel installed, and hull glassed this fall before cold weather shuts us down.

A new page on the Sara B website for Project 2010 with a link to the dreaded To-Do List. We'll try to keep this up-to-date so you'll know where we're at and what needs to be done. If you have a little time and see something you might be able and willing to help out with, let us know at sarab@brownroad.com or call Sue at 315-594-1906.

Back to work ...



Back to indexPrevious PostNext Post